CalWEA's Archived Filings

These are archived regulatory filings.

If you are looking for documents not listed here, check our Recent Filings page or contact us.




CalWEA Filings Before the California Public Utilities Commission

2010

11/22/10 - Reply Comments on Renewable Integration Model Methodologies

10/08/10 - Reply Comments on Workshop on CAISO/PG&E Renewables Integration Modeling

09/27/10 - Comments on PD Modifying Decision 10-03-21 (TRECs)

08/24/10 - Further Comments (with IEP) on 2010 Procurement Plan

07/09/10 - Comments on Staff Draft 33% RPS Modeling for Long-Term Procurement Planning Process

07/02/10 - Response (with LSA) to SCE Motion to Further Amend 2010 Procurement Plan

06/18/10 - Comments (with LSA) on PG&E's Amendment to 2010 Procurement Plan

05/12/10 - Post-Workshop Reply Comments on TRECs

05/10/10 - Reply to Responses to Joint Petition to Modify TRECs Decision

05/04/10 - Response to Utilities' Petition for Modification on TRECs Decision

04/23/10 - Response (with LSA) to SCE's Motion to Amend Its 2010 RPS Procurement Plan

03/12/10 - Comments (with CCC) on Phase 1 (Resource Adequacy/Std Capacity Product) Issues

03/04/10 - Response (with LSA) to PG&E Update on 2010 Procurement Plan

03/04/10 - Reply Brief on OII to Promote Transmission Infrastructure

02/16/10 - Emergency Motion for an Expedited Order on Curtailment Issues

01/19/10 - Comments (with LSA) on 2010 RPS Procurement Plans

01/19/10 - Comments on Revised PD on Use of Renewable Energy Credits for RPS



2009

11/24/09 - CPUC Regarding Tehachapi Renewable Transmission Project

08/29/09 - Comments (with Solar Alliance, LSA, Vote Solar) on the 33% RPS Analysis Report Adequacy Decision

07/22/09 - Application (with TURN, AWEA, SA) for Rehearing of Resource Adequacy Decision

06/09/09 - Reply Comments (with AWEA, SA, LSA) on Proposed Decision on Resource Adequacy Counting Rules

06/04/09 - Opening Comments (with AWEA, SA, LSA) on Proposed Decision on Resource Adequacy Counting Rules

06/01/09 - Motion (with AWEA, CEERT, LSA, DRA, SA) to Reconsider Ruling on Resource Adequacy

05/26/09 - Reply Comments on PD on Imperial Valley & Project Viability Issues

05/21/09 - Comments on PD on Imperial Valley & Project Viability Issues

05/06/09 - Motion to Accept NERC IVGTF Report into the Record on Resource Adequacy

05/05/09 - Project Viability Calculator - Data Request Response

04/06/09 - Comments on Tehachapi Renewable Transmission Project Draft EIR/EIS

03/06/09 - Reply Comments in Imperial Valley Renewables & Project Viability Evaluations

02/27/09 - Reply Comments (with AWEA & Solar Alliance) on Resource Adequacy Counting Rules

02/27/09 - Comments on Encouraging Imperial Valley Renewables & Project Viability Evaluations

02/23/09 - Prehearing Conference Statement on Use of RETI in Commission Proceedings

02/17/09 - Opening Comments (with AWEA, Solar Alliance) on Resource Adequacy Counting Rules

02/05/09 - Comments on Draft Resolution E-4199 re Above-Market Funds Policies

01/15/09 - Resource Adequacy Proposal for Intermittent Resources (with AWEA)



2008

12/01/08 - Reply Comments (with LSA, CCC, SA) on Draft Resolution E-4124 on MPR

     Attachment: CalWEA et al correction to SDG&E revised MPR model

11/24/08 - Comments (with LSA, CCC, Solar Alliance) on Draft Resolution E-4124 on MPR

10/15/08 - Comments (with LSA) on 2009 RPS Procurement Plans

10/14/08 - Reply Comments (with CCC, LSA and SA) on Proposed Decision on MPR

10/06/08 - Opening Comments (with CCC, LSA and SA) on Proposed Decision of MPR

07/14/08 - Reply Comments (with LSA) on SB 1036/Above-Market Funds

07/08/08 - Comments (with LSA) on SB 1036/Above-Market Funds

07/08/08 - Comments (with LSA, IOUs) on SB 1036/Above-Market Funds

06/18/08 - Post-Workshop Reply Comments (with CCC, LSA, SA) on 2008 MPR

06/06/08 - Post-Workshop Opening Comments (with CCC, LSA and Solar Alliance) on 2008 MPR

     Attachment: CalWEA/CCC/LSA/SA Proposed Changes for the 2008 MPR Model

06/02/08 - Comments (with LSA) on Greenhouse Gas Regulatory Strategies

05/12/08 - Opening Comments on Resource Adequacy - Wind Valuation

05/09/08 - Pre-Workshop Comments (with LSA) on SB 1036 Implementation (AMF) Issues

04/18/08 - Comments on SCE Application (U 338-E) on a Renewable Integration and Advancement Program

04/16/08 - Comments (with solar companies) on OII/OIR on Transmission for Renewable Resources

04/01/08 - Comments (with solar companies) on Draft Resolution E-4160 (re above-market funds)

03/06/08 - Pre-Workshop Comments (with CCC & CSP) on 2008 MPR

     Attachment: CalWEA/CCC/CSP 2008 Proposed MPR Model

02/28/08 - Comments (with solar companies) on Proposed Decision on Greenhouse Gas Regulatory Strategies

02/22/08 - CALWEA Letter Regarding TURN Protest to Daggett Wind Project

02/05/08 - Comments on 2008 Procurement Plan PD (re TOD Factors)



2007

12/06/07 - Pre-hearing conference statement (with CCC) on the 2008 Market Price Referent (MPR)

09/17/07 - Reply Comments on Alternate PD on QF Avoided Cost Pricing

09/10/07 - Comments on Alternate PD on QF Avoided Cost Pricing

09/10/07 - Comments (with GPI, CSPA) on PD on MPR Greenhouse-Gas Adder

09/10/07 - Comments (with GPI, CSPA) on 2007 MPR Draft Resolution E-4118

08/14/07 - Comments on Draft Resolution E-4052 Re SCE Transmission Study & CRETI

08/01/07 - Brief on PG&E Long-Term Procurement (re wind “back-up”)

06/25/07 - Petition (with GPI) for Modification of CPUC MPR Decision, to Apply GHG Adder

06/04/07 - Reply Comments on CPUC Draft Resolution E-4052 Approving SCE Transmission Study

06/04/07 - Reply Comments on Proposed Decision on Policy and Pricing for Qualifying Facilities

05/29/07 - Comments on CPUC Draft Resolution E-4052 Approving SCE Transmission Study

05/25/07 - Comments on the Proposed Decision On Policy and Pricing For Qualifying Facilities

04/23/07 - Comments on SCE Advice Letter 2062-E-A on Transmission Study Costs

02/16/07 - CalWEA Response to Energy Division’s 2006 Resource Adequacy Report

02/01/07 - Comments on Proposed Decision on 2007 RPS Procurement Plans

01/05/07 - Comments on RPS Bid Evaluation Transparency Documents



2005

10/25/05 - Reply comments on Renewables Transmission Investigation (I.05-09-005)

10/03/05 - Reply Comments on PD on Utility Long-Term RPS Plans (Repowering)

09/30/05 - Comments on Renewables Transmission Investigation (I.05-09-005)

08/31/05 - Coalition Testimony on PURPA & QF Pricing Policies

08/31/05 - Opening Testimony (with Renewables Coalition) on QF Avoided Cost Issues

08/05/05 - Post-Workshop Brief (with CCC, CBEA) on 2005 MPR Methodology & Inputs

07/11/05 - Comments on Proposed Revisions to Transmission Bid Adder Methodology

07/11/05 - Comments on Draft Decision on RPS Procurement Plans

05/06/05 - Comments on Draft Utility RFPs for Renewables

04/08/05 - Comments on Transmission Cost Recovery Issues

04/07/05 - Comments on Utility RPS Procurement Plans

04/06/05 - Comments on the Tehachapi Collaborative Study Group Report

02/28/05 - Comments (with CBEA & CCC) on the Revised 2004 RPS Market Price Referent Staff Report

02/18/05 - Comments Regarding RPS & Tradable Renewable Energy Credits

02/11/05 - Comments on Time-of-Delivery Market Price Referents for the RPS



2004

11/10/04 - Renewables Coalition Proposal for a Long-Term Qualifying Facility Policy

11/03/04 - Prehearing Conference Statement on PURPA / Avoided Cost Issues (with CCC and CBEA)

09/28/04 - PHC Statement on Refinement of RPS Transmission Bid Adder Methodology

06/04/04 - Opening Brief on RPS Least-Cost, Best-Fit Bid Evaluation Rules

06/01/04 - CalWEA Comments on Transmission Cost Bid Adder

06/01/04 - CalWEA Comments (with Oak Creek) on Tehachapi Alternate Proposed Decision

05/28/04 - CalWEA Comments (with CBEA & Calpine) on Proposed Decision on RPS Standard Contract Terms

04/19/04 - CalWEA Reply Comments on Proposed Interim Methodology for RPS Transmission Bid Adders

04/15/04 - Response (with the Cal. Cogen. Council) to SCE Petition on SO1 Issue

04/14/04 - Reply Brief (with CBEA and Vulcan Power) on RPS Standard Contract Terms

04/14/04 - CalWEA Comments on Proposed Interim Methodology for RPS Transmission Bid Adders

04/09/04 - Comments (with CBEA) for the RPS Market Price Referent Workshop

03/29/04 - Reply Comments on Proposed Decision on Tehachapi Transmission

03/26/04 - Opening Brief (with CBEA and Vulcan Power) on Standard Terms Language

03/22/04 - Comments on Proposed Decision on Tehachapi Transmission

03/02/04 Pre-Hearing Conference Statement on Transmission Costs for RPS Bids



2003

12/03/03 - Reply Brief on RPS Standard Contract Terms

11/12/03 - Opening Brief on RPS Standard Contract Terms

09/16/03 - Emergency Motion on Edison's August 2003 RFP

09/11/03 - Reply to SCE's Reply on Transmission Decision (PU Code Sec. 399.25)  

08/28/03 - Response to Application of SCE for Rehearing of Transmission (PU Code Sec. 399.25)

06/16/03 - Reply Comments on Judge Allen's Proposed RPS Decision

06/09/03 - Comments on Judge Allen's Proposed Decision on the RPS

05/05/03 - RPS Reply Brief

04/28/03 - RPS Opening Brief




If you are looking for documents not listed here, check our Recent Filings page or contact us.


Fast Facts about California Wind Energy

+ As a result of strong public policy, California was the first U.S. state in which large wind energy projects were developed, beginning in the early 1980's.

+ Wind energy projects totaling 3,141 MW of capacity are operating in California today, providing enough electricity to power about 829,000 California households. 1 This represents a near-doubling of capacity since California's RPS law was adopted in 2002.

+ Wind energy projects comprise most of the development that has occurred under California's renewable energy law as of 2010.

View figure larger >>>


Read More Fast Facts >>>





Highlights

An Editorial: CalWEA Executive Director Answers the Question: Is the RPS Working? Read more >>>

Nature Writer Bill McKibben -- “[W]hat we need to say is: every bird, and everything else that we know, is fundamentally at risk in the next few decades. In the name of birds, I want that windmill on my ridge. In the name of wild beauty, I want that windmill out my window……” Read more >>>

The Birds and The Breeze - from Sierra Magazine, “According to a 2003 study of 4,700 turbines located outside California, each killed 2.3 birds per year. That's a tiny number compared with the hundreds of millions of birds that fall prey to cats every year……and it pales in comparison to the number of birds and other creatures that would be killed by catastrophic global warming.” Read more >>>

CalWEA addresses wind energy’s reliability in this Energy Circuit Editorial – “The initial results from a California Energy Commission study show that the California grid has the technical capability to include 20 percent intermittent generation under a 33 per­cent renewable goal without the need for significant new resources to accommodate the variability of these intermittent renewables.” Read more >>>